• Architecture • BIM • Engineering • Design Coordination • Architecture • BIM • Engineering • Design Coordination
Project : 1000 Mahler, Zuidas Amsterdam
Type : Offices
Status : Realised
Client : G&S Vastgoed, G&S Bouw
Architect : OeverZaaijer
Role : BIM-Architecture, BIM Civil, Clash detection and drawings for MEP
Area : 11000.00 sq.mt.
Information :  
At the heart of the Business district of Amsterdam, the Zuidas, the 1000 Mahler offices have been built. In order to execute the design as desired, an architectural and structural BIM was created. Clashdetection and optimisation of the project was realised, before and after involving the suppliers of the contractor.
 
Powered by Phoca Gallery